The 13 cars used in Phase I tests are connected to each other with a digital automatic coupling. In addition to the mechanical and pneumatic connection, the electric coupling has a continuous power and data line. It is to replace the screw coupling in Europe by 2030. About half a million cars and over 15000 locomotives are to be modified. |
Date:
3/23/2022 |
Location:
Muttenz, CH Map ![Show Muttenz on a rail map](/images/map_us.gif) |
Views:
88 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Peider SwissTrip |
|
Author: Peider SwissTrip
|
![Digital Automatic Coupling test train in Switzerland](/pictures\143984\DAK0PeiderSwissTrip220323Muttenz.jpg) |
Picture Categories: |
This picture is part of album: European Digital Automatic Coupling test train in Switzerland |